Difference between revisions of "Template:PCN SMA Changes"

From Teltonika Networks Wiki
(Created page with "==2024.05.15: Updated SMA connectors== Starting from August 2024, {{{name}}} devices will be manufactured with updated SMA connectors. {| class="wikitable" |- | style="width:...")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
==2024.05.15: Updated SMA connectors==
+
==2024.05.15: SMA Connector Update==
  
 
Starting from August 2024, {{{name}}} devices will be manufactured with updated SMA connectors.
 
Starting from August 2024, {{{name}}} devices will be manufactured with updated SMA connectors.
Line 16: Line 16:
 
|-
 
|-
 
| style="width: 221px; text-align: left; background: white;" rowspan="3" | Detailed description
 
| style="width: 221px; text-align: left; background: white;" rowspan="3" | Detailed description
| style="width: 908px; text-align: left; background: white;" colspan="2" | Starting from August 2024, {{{name}}} devices will be manufactured with updated PCB and RP-SMA, SMA connectors.
+
| style="width: 908px; text-align: left; background: white;" colspan="2" | Starting in August 2024, {{{name}}} devices will be manufactured with updated RP-SMA and SMA connectors. This update will not affect the functionality of the SMA connectors; it is only a change in their form. In the photos displayed below, you can see the change.
'''Important Note:''' That PCB changes will not impact the functionality of the device but due to this hardware change downgrading to firmware versions below RutOS {{{FW}}} is no longer supported.
 
 
 
From:
 
 
 
RP-SMA Lead-free Female PCB Socket SMD Straight Horizontal Edge Mount 50ohm 0-6GHz VSWR<1.35
 
 
 
SMA Female Lead-free PCB Socket SMD Straight Horizontal Edge Mount 50ohm 0-6GHz VSWR<1.35
 
 
 
To:
 
 
 
RP-SMA Lead-free Female PCB Socket SMD Straight Horizontal Edge Mount 50ohm 
 
 
 
SMA Lead-free Female PCB Socket SMD Straight Horizontal Edge Mount 50ohm
 
  
 
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in August 2024. During this period, your shipments of {{{name}}} may consist of either the current design or the new one described above.
 
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in August 2024. During this period, your shipments of {{{name}}} may consist of either the current design or the new one described above.
 
|-
 
|-
| style="text-align: left; background: white;" | Current design: <br><br> [[File:PCN_RUT260_SMA_Old.PNG|left|400px|link=Special:FilePath/PCN_RUT260_SMA_Old.PNG]]
+
| style="text-align: left; background: white;" | Current design: <br><br> [[File:PCN_RUT260_SMA_Old.PNG|center|400px|link=Special:FilePath/PCN_RUT260_SMA_Old.PNG]]
| style="text-align: left; background: white;" | Updated design: <br><br> [[File:PCN_RUT260_SMA_New.PNG|left|400px|link=Special:FilePath/PCN_RUT260_SMA_New.PNG]]
+
| style="text-align: left; background: white;" | Updated design: <br><br> [[File:PCN_RUT260_SMA_New.PNG|center|400px|link=Special:FilePath/PCN_RUT260_SMA_New.PNG]]
 
|-
 
|-
 
|
 
|
 
|-
 
|-
 
| style="text-align: left; background: white;" | Change reasons
 
| style="text-align: left; background: white;" | Change reasons
| style="text-align: left; background: white;" colspan="2" | Will improve manufacturing process for the manufacturer that will reduce lead times and will increase the firmness of the connectors.
+
| style="text-align: left; background: white;" colspan="2" | This will improve the effectiveness of device manufacturing.
 
|-
 
|-
 
|}
 
|}
Line 65: Line 52:
 
|-
 
|-
 
| style="width: 221px; text-align: left; background: white;" |Risk assessment
 
| style="width: 221px; text-align: left; background: white;" |Risk assessment
| colspan="2" style="width: 908px; text-align: left; background: white;" |
+
| colspan="2" style="width: 908px; text-align: left; background: white;" |No risk factors are asociated with this change.  
* Devices with the new hardware changes will not support firmware versions below {{{FW}}}
+
'''Please note:''' this product change notification does not affect any previous {{{name}}} devices, except new {{{name}}} devices that will be manufactured with this change.
* Custom firmware built on previous SDK versions will also not be supported.
 
'''Please note''': this product change notification does not affect any previous {{{name}}} devices, except new {{{name}}} devices that will be manufactured with this change.
 
 
|-
 
|-
 
| style="text-align: left; background: white;" | Suggested implementation plan
 
| style="text-align: left; background: white;" | Suggested implementation plan
 
| colspan="2" style="text-align: left; background: white;" |
 
| colspan="2" style="text-align: left; background: white;" |
Firmware downloads for the device can be found [[{{{name}}}_Firmware_Downloads|here]].
+
Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.
For more detailed information please contact your sales representative.
 
 
|-
 
|-
 
|}
 
|}

Latest revision as of 14:16, 27 May 2024

2024.05.15: SMA Connector Update

Starting from August 2024, {{{name}}} devices will be manufactured with updated SMA connectors.

PCN Number: PCN_{{{name}}}_SMA_2024.05.15
Change description
Change type Hardware change
Detailed description Starting in August 2024, {{{name}}} devices will be manufactured with updated RP-SMA and SMA connectors. This update will not affect the functionality of the SMA connectors; it is only a change in their form. In the photos displayed below, you can see the change.

Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in August 2024. During this period, your shipments of {{{name}}} may consist of either the current design or the new one described above.

Current design:

PCN RUT260 SMA Old.PNG
Updated design:

PCN RUT260 SMA New.PNG
Change reasons This will improve the effectiveness of device manufacturing.
Affected products information
Model Affected order codes Order code changes
{{{name}}} {{{name}}} ***** No changes
Upcoming change date August 2024
Change impact
Risk assessment No risk factors are asociated with this change.

Please note: this product change notification does not affect any previous {{{name}}} devices, except new {{{name}}} devices that will be manufactured with this change.

Suggested implementation plan

Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.

Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.

To download the pdf version of this notification, [[Media:PCN_{{{name}}}_SMA_2024_05_15_EN.pdf|click here]].