Changes

no edit summary
Line 20: Line 20:     
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in August 2024. During this period, your shipments of {{{name}}} may consist of either the current design or the new one described above.
 
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in August 2024. During this period, your shipments of {{{name}}} may consist of either the current design or the new one described above.
|-
  −
| style="text-align: left; background: white;" | Current design: <br><br> [[File:PCN_RUT260_SMA_Old.PNG|left|400px|link=Special:FilePath/PCN_RUT260_SMA_Old.PNG]]
  −
| style="text-align: left; background: white;" | Updated design: <br><br> [[File:PCN_RUT260_SMA_New.PNG|left|400px|link=Special:FilePath/PCN_RUT260_SMA_New.PNG]]
  −
|-
  −
|
   
|-
 
|-
 
| style="text-align: left; background: white;" | Change reasons
 
| style="text-align: left; background: white;" | Change reasons
| style="text-align: left; background: white;" colspan="2" | Will improve manufacturing process for the manufacturer that will reduce lead times and will increase the firmness of the connectors.
+
| style="text-align: left; background: white;" colspan="2" | Due to a change in the I/O controls within the 4-pin connector
 
|-
 
|-
 
|}
 
|}

Navigation menu