RUT950 Product Change Notifications: Difference between revisions
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
}} | }} | ||
__TOC__ | __TOC__ | ||
==2019.01.22: product design changes== | |||
Effective February, 2019, week 7, RUT950 routers will be produced with significant visual design improvements. | |||
{| class="wikitable" | |||
|+ | |||
! style="text-align: left; background: white;" colspan="3" | Change description | |||
|- | |||
| style="text-align: left; background: white;" | Change type | |||
| style="text-align: left; background: white;" colspan="2" | Mechanical/Housing. Electrical/Power connector. | |||
|- | |||
| style="width: 221px; text-align: left; background: white;" rowspan="3" | Detailed description | |||
| style="width: 908px; text-align: left; background: white;" colspan="2" | Housing design improved. | |||
|- | |||
| style="text-align: left; background: white;" | Current design: <br><br> [[File:Rut950 facelift before 1.png|left|300px]] <br> [[File:Rut950 facelift before 2.png|left|300px]] | |||
| style="text-align: left; background: white;" | Improved design: <br><br> [[File:Rut950 facelift after 1.png|left|300px]] <br> [[File:Rut950 facelift after 2.png|left|300px]] | |||
|- | |||
| style="text-align: left; background: white;" colspan="2" | Flat surface mounting possibility integrated. | |||
RJ45 socket direction changed.<br> | |||
Power supply connector changed from 2-pin to 4-pin.<br> | |||
SMA connector positions changed.<br> | |||
Sim cards now have dedicated external slots.<br> | |||
Top sticker design changes.<br> | |||
Housing dimensions (mm):<br> | |||
Before: 105.5 (W) x 80 (D) x 45.8 (H) After: 109.5 (W) x 100 (D) x 50 (H)<br> | |||
Mounting space requirements (mm):<br> | |||
Before: 110 (W) x 145 (D) x 51 (H) After: 110 (W) x 145 (D) x 51 (H) | |||
|- | |||
| style="text-align: left; background: white;" | Change reasons | |||
| style="text-align: left; background: white;" colspan="2" | Mechanical changes - design improvement. | |||
|- | |||
| style="text-align: left; background: white;" | Product release date | |||
| style="text-align: left; background: white;" colspan="2" | December 2018, week 50 | |||
|- | |||
|} | |||
{| class="wikitable" | |||
|+ | |||
! style="text-align: left; background: white;" colspan="3" | Affected products information | |||
|- | |||
| style="width: 221px; text-align: left; background: white;" | Model | |||
| style="width: 448px; text-align: left; background: white;" | Affected order codes | |||
| style="width: 448px; text-align: left; background: white;" | Order code changes | |||
|- | |||
| style="text-align: left; background: white;" | RUT955 | |||
| style="text-align: left; background: white;" | RUT955 *****0 | |||
| style="text-align: left; background: white;" | RUT955 *03**0 | |||
|- | |||
| style="text-align: left; background: white;" | Product release date | |||
| style="text-align: left; background: white;" colspan="2" | February, 2019, week 7 | |||
|- | |||
|} | |||
{| class="wikitable" | |||
|+ | |||
! style="text-align: left; background: white;" colspan="3" | Change impact | |||
|- | |||
| style="width: 221px; text-align: left; background: white;" | Risk assessment | |||
| style="width: 908px; text-align: left; background: white;" colspan="2"| Marketing material such as photos might need replacing. Cable management and integration procedures might need reviewing due to minor connector layout and visual changes | |||
|- | |||
| style="text-align: left; background: white;" | Suggested implementation plan | |||
| style="text-align: left; background: white;" colspan="2"| Marketing material can be found at our wiki: https://wiki.teltonika-networks.com.<br>List of changes included in this PCN will help adopting to changes. | |||
|- | |||
|} | |||
{| class="wikitable" | |||
|+ | |||
! style="width: 1141px; text-align: left; background: white;" colspan="3" | Acknowledgement of PCN receipt | |||
|- | |||
| style="text-align: left; background: white;" colspan="3"| If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above | |||
|- | |||
|} | |||
To download the pdf version of this notification, [[Media:PCN RUT955 20190122 EN.pdf|click here]]. | |||
==2018.12.04: supported LTE band changes== | ==2018.12.04: supported LTE band changes== | ||
Revision as of 15:05, 22 January 2019
Main Page > EOL Products > RUT950 > RUT950 Product Change NotificationsProduct change notifications (PCN) is a way of informing customers of upcoming changes related to Teltonika Networks products. This includes outward appearance adjustments, hardware improvements, changes to package contents, etc. Changes related to a product's firmware are not included in PCNs ([[{{{name}}}_Firmware_Downloads|click here]] to see the firmware changelog).
This page stores information regarding changes to the [[{{{name}}}]] device. Below you will find a list of both upcoming and already implemented changes sorted by newest to oldest (top to bottom).
2019.01.22: product design changes
Effective February, 2019, week 7, RUT950 routers will be produced with significant visual design improvements.
Change description | ||
---|---|---|
Change type | Mechanical/Housing. Electrical/Power connector. | |
Detailed description | Housing design improved. | |
Current design: |
Improved design: | |
Flat surface mounting possibility integrated.
RJ45 socket direction changed. | ||
Change reasons | Mechanical changes - design improvement. | |
Product release date | December 2018, week 50 |
Affected products information | ||
---|---|---|
Model | Affected order codes | Order code changes |
RUT955 | RUT955 *****0 | RUT955 *03**0 |
Product release date | February, 2019, week 7 |
Change impact | ||
---|---|---|
Risk assessment | Marketing material such as photos might need replacing. Cable management and integration procedures might need reviewing due to minor connector layout and visual changes | |
Suggested implementation plan | Marketing material can be found at our wiki: https://wiki.teltonika-networks.com. List of changes included in this PCN will help adopting to changes. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.
2018.12.04: supported LTE band changes
Effective February 2019, RUT950 routers will have different supported LTE bands.
Change description | ||
---|---|---|
Change type | Different LTE band support | |
Detailed description | Supported LTE frequency band list updated: Added LTE FDD B28 Removed LTE FDD/WCDMA B5, LTE TDD B38,B40,B41 | |
Change reasons | LTE B28 support | |
Product release date | February 2019 |
Affected products | ||
---|---|---|
Model | Affected order codes | Order code changes |
RUT950 | RUT950 H***** | RUT950 U***** |
Change impact | ||
---|---|---|
Risk assessment | Device behaviour might change due to supported band list changes | |
Suggested implementation plan | If any band mismatch is suspected - samples are available to order. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.
2018.11.16: new top sticker
Effective December 2018, week 50, RUT950 routers will be produced with a new top sticker.
Change description | ||
---|---|---|
Change type | External/visual | |
Detailed description | Top sticker design improved | |
Old version: |
New version: | |
Change reasons | Visual changes | |
Product release date | December 2018, week 50 |
Affected products | ||
---|---|---|
Model | Affected order codes | Order code changes |
RUT950 | RUT950 *****0 | No changes |
Change impact | ||
---|---|---|
Risk assessment | Marketing material such as photos might need replacing | |
Suggested implementation plan | Related marketing material can be found here |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.