BAT120 Product Change Notifications: Difference between revisions
No edit summary |
|||
Line 21: | Line 21: | ||
*IN PWR LED (Green): When the PSU is connected to the IN PWR socket, the LED will turn green, indicating that the battery is actively charging. | *IN PWR LED (Green): When the PSU is connected to the IN PWR socket, the LED will turn green, indicating that the battery is actively charging. | ||
*IN PWR LED (Red): If the PSU is connected to the IN PWR socket but there is a charge failure or the input voltage (Vin) is too low, the LED will turn red, alerting you to the issue. | *IN PWR LED (Red): If the PSU is connected to the IN PWR socket but there is a charge failure or the input voltage (Vin) is too low, the LED will turn red, alerting you to the issue. | ||
*OUT PWR LED (Green): When an external device is being powered through the OUT PWR socket, the LED will illuminate in green, | *OUT PWR LED (Green): When an external device is being powered through the OUT PWR socket, the LED will illuminate in green, indicating normal operation and successful power delivery to an external device.* | ||
*OUT PWR LED (Red): If the OUTPUT is shorted (requiring a reset) or the BAT120 has overheated (no reset needed), the OUT PWR LED will turn red, signifying an issue that needs attention. | *OUT PWR LED (Red): If the OUTPUT is shorted (requiring a reset) or the BAT120 has overheated (no reset needed), the OUT PWR LED will turn red, signifying an issue that needs attention. | ||
*POWER LEDs (Blinking every 5 seconds): | *POWER LEDs (Blinking every 5 seconds): Each LED representing 25% of the battery's charge. | ||
<small><nowiki>*</nowiki>OUT PWR LED will illuminate green when connected load is greater than 0.5W. If the power consumed by an external device is less than 0.5W, it will still be powered, but OUT PWR LED will stay off.</small> | |||
|- | |- | ||
| style="text-align: left; background: white;" | Change reasons | | style="text-align: left; background: white;" | Change reasons |
Revision as of 09:42, 22 August 2023
Main Page > BAT Uninterruptable Power Supplies > BAT120 > BAT120 Product Change NotificationsProduct change notifications (PCN) is way of informing customers of upcoming changes related to Teltonika products. This includes outward appearance adjustments, hardware improvements, changes to package contents, etc.
This page stores information regarding changes made to the BAT120 device. Below you will find a list of both upcoming and already implemented changes sorted from newest to oldest (top to bottom).
2023.09.01: Product technical changes
Starting from 2023 Q3 BAT120 Uninterruptable Power Supply will be changed.
Change description | ||
---|---|---|
Change type | LED Indicators, Faster Charging | |
Detailed description | The updated BAT120 will has several updated specifications, including enhancements to the LED indicators and an increase in battery charge current, resulting in improved charging for the device.
The LED indicators will now provide updated information:
*OUT PWR LED will illuminate green when connected load is greater than 0.5W. If the power consumed by an external device is less than 0.5W, it will still be powered, but OUT PWR LED will stay off. | |
Change reasons | Improved LED indicators and enhanced battery charging for better user experience |
Affected products information | ||
---|---|---|
Model | Affected order codes | Order code changes |
BAT120 | BAT120 ***** | No changes |
Upcoming change date | 2023 Q3 |
Change impact | ||
---|---|---|
Risk assessment | The product handling and storage process may require review. Marketing materials, such as photos, might need replacement. | |
Suggested implementation plan | Information included in this PCN will help adapt to the upcoming changes. For more detailed information please contact your sales representative. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.
2023.05.24: QSG flyer replacement
Starting in Q3 of 2023, BAT120 uninterruptable power supply will come with a new QSG flyer in the packaging.
Change description | ||
---|---|---|
Change type | Replacement of QSG flyer | |
Detailed description | BAT120 devices manufactured starting from Q3 2023 will have a new QSG flyer in the packaging. The new QSG flyer includes multiple languages, English, German, Spanish, French, Italian, the short version of QSG with a QR code/link to the full Web QSG version: teltonika-networks.com/QSG_BAT120 | |
Previous design: |
New design: | |
The new flyer will include QR codes with URL links to RMS and the Web version of the QSG (Quick Start Guide) for the BAT120. | ||
Change reasons | Reducing environmental impact. |
Affected products information | ||
---|---|---|
Model | Affected order codes | Order code changes |
BAT120 | BAT120 ****** | No changes |
Upcoming change date | 2023, Q3 |
Change impact | ||
---|---|---|
Risk assessment | Marketing material such as photos might need replacing. | |
Suggested implementation plan | Information included in this PCN will help adapt to the upcoming changes. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.
2023.02.09: QSG flyer replacement
Starting from 2023, week 7, BAT120 power supply will come with a new QSG flyer in the packaging.
Change description | ||
---|---|---|
Change type | Replacement of QSG flyer | |
Detailed description | BAT120 devices manufactured starting from Q1 2023 will have a new QSG flyer in the packaging. The new QSG flyer includes the short version of QSG with a QR code/link to the full Web QSG version: teltonika-networks.com/QSG_BAT120 | |
Previous design: |
New design: | |
The new flyer will include QR codes with URL links to RMS and the Web version of the QSG (Quick Start Guide) for the BAT120. | ||
Change reasons | Reducing environmental impact. |
Affected products information | ||
---|---|---|
Model | Affected order codes | Order code changes |
BAT120 | BAT120 ****** | No changes |
Upcoming change date | 2023, week 7 |
Change impact | ||
---|---|---|
Risk assessment | Marketing material such as photos might need replacing. | |
Suggested implementation plan | Information included in this PCN will help adapt to the upcoming changes. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.