Changes

no edit summary
Line 6: Line 6:     
__TOC__
 
__TOC__
==2020.10.20: top device marking changes==
+
==2020.10.16: top device marking changes==
    
Effective 2020, week 51, RUT230 router top stickers will be replaced by laser engravings transitional period is 1 month.  
 
Effective 2020, week 51, RUT230 router top stickers will be replaced by laser engravings transitional period is 1 month.  
Line 62: Line 62:  
|}
 
|}
   −
To download the pdf version of this notification, [[Media:PCN_RUT230_20201021_EN.pdf|click here]].
+
To download the pdf version of this notification, [[Media:PCN_RUT230_20201016_EN.pdf|click here]].
    
==2020.08.14: changes in bottom labeling==
 
==2020.08.14: changes in bottom labeling==
Line 418: Line 418:     
To download a pdf version of this notification, [[Media:PCN RUT230 20181116 EN.pdf|click here]].
 
To download a pdf version of this notification, [[Media:PCN RUT230 20181116 EN.pdf|click here]].
 +
 +
[[Category:RUT230]]