Jump to content

OTD144 Product Change Notifications

From Teltonika Networks Wiki

Product change notifications (PCN) is a way of informing customers of upcoming changes related to Teltonika Networks products. This includes outward appearance adjustments, hardware improvements, changes to package contents, etc. Changes related to a product's firmware are not included in PCNs (click here to see the firmware changelog).

This page stores information regarding changes to the OTD144 device. Below you will find a list of both upcoming and already implemented changes sorted by newest to oldest (top to bottom).

2026.06.19: Packaging Box Changes

Beginning in 2026 September, the mass packaging for OTD144 will updated with the following changes.

PCN Number: PCN_OTD144_Packaging Box Changes_2026.06.19_EN
Change description
Change type Packaging changes
Detailed description Starting in 2026 September, packaging of the OTD144 device will be updated. Crumpled paper filler will replace the previously used plastic filler in shipping cartons to fill empty spaces and provide additional protection during transportation.

Please note that this change will be implemented gradually, throughout a 2-month transitional period starting from September, 2026. During this period, your shipments of OTD144 may consist of either the current design or the new one described above.

Current packaging:


Updated packaging:


Change reasons
  • Enhanced Product Protection: Individual packaging ensures better protection during handling and transit.
  • Sustainability & Waste Reduction: Optimized packaging reduces material waste and improves overall environmental sustainability.
Affected products information
Model Affected order codes Order code changes
OTD144 OTD144 ****** N/A
Upcoming change date 2026 September
Change impact
Risk assessment
  • Changes to packaging materials may impact packaging-related documentation and visual assets that reference the previous packaging configuration.
  • No impact on product functionality or technical specifications.
Suggested implementation plan
  • Inform relevant warehouse and logistics personnel about the packaging changes.
  • If necessary, contact your sales representative for further guidance and support.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above

To download the pdf version of this notification, click here.