TRB141 Product Change Notifications: Difference between revisions
(Created page with "{{Template:pcn intro | name = TRB141 | series = TRB14x | firmware = TRB141_Firmware_(EU) }} __TOC__ ==2020.06.12: RUTOS support== Effective since June 03, 2020, TRB140...") |
No edit summary |
||
Line 8: | Line 8: | ||
==2020.06.12: RUTOS support== | ==2020.06.12: RUTOS support== | ||
Effective since June 03, 2020, | Effective since June 03, 2020, TRB141 support RUTOSv2.3, available at <b>[[TRB140 Firmware Downloads|TRB140 Firmware downloads]]</b>. | ||
{| class="wikitable" | {| class="wikitable" |
Revision as of 11:55, 16 June 2020
Main Page > TRB Gateways > TRB141 > TRB141 Product Change NotificationsProduct change notifications (PCN) is a way of informing customers of upcoming changes related to Teltonika Networks products. This includes outward appearance adjustments, hardware improvements, changes to package contents, etc. Changes related to a product's firmware are not included in PCNs (click here to see the firmware changelog).
This page stores information regarding changes to the TRB141 device. Below you will find a list of both upcoming and already implemented changes sorted by newest to oldest (top to bottom).
2020.06.12: RUTOS support
Effective since June 03, 2020, TRB141 support RUTOSv2.3, available at TRB140 Firmware downloads.
Change description | |||
---|---|---|---|
Change type | Firmware | ||
Detailed description | Added RutOS Support for TRB14x series gateways | ||
Change reasons | Until now different TRB series gateways had their own FW version depening on LTE module. After this update FW will become common to all TRB14x gateways. |
Affected products information | ||
---|---|---|
Model | Affected order codes | Order code changes |
TRB140 | TRB140 ****** | No changes |
Change impact | ||
---|---|---|
Risk assessment | Migration from TRB1400_R_00.01.06.1 or older requires Legacy firmware RUTOSv2.3 includes Basic and Advanced modes, so some functionality may appear missing until Advanced mode is selected. | |
Suggested implementation plan | Special preparations are unneeded. |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above. |
To download the pdf version of this notification, click here.