Product change notifications (PCN) is way of informing customers of upcoming changes related to Teltonika products. This includes outward appearance adjustments, hardware improvements, changes to package contents, etc.
This page stores information regarding changes made to the TSW200 device. Below you will find a list of both upcoming and already implemented changes sorted from newest to oldest (top to bottom).
2024.11.25: New hardware revision
Starting from 2024 Q4, TSW200 switch will be produced with new hardware revision. These changes include transition to PoE alternative A instead of alternative B and and SFP connector recess.
PCN Number: PCN_TSW200_New_Hardware_2024_11_22
Change description
Change type
Hardware change
Detailed description
In order to ensure better compatibility with other devices, starting from 2024 Q4, TSW200 switch will be produced with PoE alternative A. For more information about PoE alternative A and alternative B, please visit: wiki.teltonika-networks.com/view/TSW200_First_Start
The SFP connector will be recessed by 3mm, ensuring precise and secure positioning. Its surface aligns flush with the panel, maintaining a clean and uniform appearance. This condition has no effect on functionality or performance.
Previous revision:
New revision:
Change reasons
Increasing compatibility and reducing lead times
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 *0****
No changes
Upcoming change date
2024 Q4
Change impact
Risk assessment
Devices exclusively dependent on PoE alternative B will be incompatible with the TSW200 switch. However, it's important to note that such instances are uncommon.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2024.09.18: EAN Code Change
Starting from October 1st 2024, new order codes created will have their own unique EAN codes.
The product identification system is being updated by assigning unique EAN codes to each new order code created from October 1st.
Change reasons
Improving product traceability, inventory management, and logistics accuracy across ordering and distribution systems.
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 *****
No changes
Upcoming change date
October 1st, 2024
Change impact
Risk assessment
Every order code, created after this change, will have its own unique EAN code. Therefore, it might cause the need to review inventory management and ordering processes.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2024.03.19: Visual colour housing changes
Beginning in July 2024, TSW200 switch will be manufactured with a different colour housing.
PCN Number: PCN_TSW200_2024_03_19_EN
Change description
Change type
Housing colour
Detailed description
TSW200 devices will be produced with a new black housing.
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting in July 2024. During this period, your shipments of TSW200 may consist of either the current design or the new one described above.
Current design:
New design:
The housing dimensions will not be changed.
Change reasons
Design improvement.
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 ******
N/A
Upcoming change date
2024 July
Change impact
Risk assessment
Marketing material such as photos might need replacing.
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above
To download the pdf version of this notification, click here.
2024.03.19 TSW200 DIN Rail bracket change
Starting from 2024 Q2, TSW200 switch will be produced with integrated DIN Rail bracket.
PCN Number: PCN_TSW200_2023.03.19
Change description
Change type
Mechanical
Detailed description
Beginning in Q2 of 2024, the current screw-on DIN Rail bracket in the TSW200 switch will be replaced with an integrated one. The new DIN Rail bracket will be shifted to the left by 0.96 mm.
Please note that this change will be implemented gradually, throughout a 3-month transitional period starting from Q2 2024, batch 33. During this period, your shipments of TSW210 may consist of either the current screw-on DIN Rail bracket or the new one described above. For inquiries regarding custom order codes, please contact your designated sales representative.
Old DIN Rail bracket:
New DIN Rail bracket:
Dimensions of old DIN Rail bracket:
Dimensions of new DIN Rail bracket:
Packaging dimensions will not change.
Change reasons
Structural improvement
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 ******
No changes
Upcoming change date
2024 Q2
Change impact
Risk assessment
The product handling process may require review. Marketing materials, such as photos, might need replacement.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2024.01.18: EEPROM Change
Starting from 2024 Q2, TSW200 switch will be produced with a different EEPROM hardware component.
PCN Number: PCN_TSW200_2024_01_18_EN
Change description
Change type
Hardware change
Detailed description
In order to reduce lead times for TSW200 switch, starting from 2024 Q2, the EEPROM hardware component will be replaced with an analog part.
Change reasons
Decreasing product lead time
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 *****
No changes
Upcoming change date
2024 Q2
Change impact
Risk assessment
No risk factors have been identified during the evaluation of this change. However, it is recommended to conduct an independent review to ensure alignment with specific circumstances and requirements
Suggested implementation plan
No implementation plan needed.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2023.08.02: Product packaging changes
Starting from 2023 Q3 TSW200 product packaging will be changed.
Change description
Change type
Packaging
Detailed description
The packaging for the product will undergo several updates including an update to the side print of the box. Additionally, the box will now feature press with certificates that will be printed according to the region. Finally, there will also be changes made to the company information section including the address, telephone number, email and website link.
Current design:
Updated packaging design:
Packaging dimensions will not change.
Change reasons
Design improvement.
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 *****
No changes
Upcoming change date
2023 Q3
Change impact
Risk assessment
The product handling and storage process may require review. Marketing materials, such as photos, might need replacement.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information, please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above
To download the pdf version of this notification, click here.
2023.05.20: Product packaging changes
Starting in Q2 of 2023, changes will be made to the packaging of the TSW200 product.
Change description
Change type
Packaging
Detailed description
Starting from Q2 2023, the current polyurethane foam insert used for TSW200 will be substituted with a honeycomb insert made from cardboard.
Current:
New:
Packaging dimensions will not change.
Change reasons
This change will lead to an improvement in the structural stability, impact resistance, and environmental impact reduction.
Affected products information
Model
Current order code
Order code changes
TSW200
TSW200 000040
No changes
Upcoming change date
2023 Q2
Change impact
Risk assessment
The product handling and storage process may require review. Marketing materials, such as photos, might need replacement.
Suggested implementation plan
The information included in this PCN will help adapt to the upcoming changes. For more detailed information, please get in touch with your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2023.05.17: Product packaging changes
Starting from Q3 2023 TSW200 product packaging will be changed.
Change description
Change type
Packaging
Detailed description
Starting from Q3 2023 TSW200 polyurethane foam insert will be replaced by honeycomb insert made from cardboard.
Current:
New:
Packaging dimensions will not change.
Change reasons
This change will improve structural stability, enhance impact resistance, and reduce environmental impact.
Affected products information
Model
Current order code
New order code
TSW200
TSW200 000050
No changes
Upcoming change date
2023 Q3
Change impact
Risk assessment
The product handling and storage process may require review. Marketing materials, such as photos, might need replacement.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2023.04.17: Product packaging changes
Starting from Q3 2023 TSW200 product packaging will be changed.
Starting from Q3 2023 TSW200 polyurethane foam insert will be replaced by honeycomb insert made from cardboard.
Current design:
Updated packaging design:
Packaging dimensions will not change.
Change reasons
This change will improve structural stability, enhance impact resistance, and reduce environmental impact.
Affected products information
Model
Current order code
New order code
TSW200
TSW200 ******
No changes
Upcoming change date
2023 Q3
Change impact
Risk assessment
The product handling and storage process may require review. Marketing materials, such as photos, might need replacement.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes. For more detailed information please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2023.02.13: MAC address range change
All Teltonika Networks devices manufactured starting from 2023, week 9 will have additional new MAC address range.
Change description
Change type
MAC address range
Detailed description
All Teltonika Networks devices manufactured starting from 2023, week 9 may have a MAC address from the new MAC address range 20:97:27:00:00:00 - 20:97:27:FF:FF:FF, as well as the current MAC address range 00:1E:42:00:00:00 - 00:1E:42:FF:FF:FF
Change reasons
Endpoint of the previous MAC address range.
Affected products information
Model
Affected order codes
Order code changes
All Teltonika Networks devices
All order codes
No changes
Upcoming change date
2023, week 9
Change impact
Risk assessment
Device install procedures or any automated solutions might need modifications.
Suggested implementation plan
For more detailed information please contact your sales representative.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.
2022.10.24: QSG flyer replacement
Starting from 2022, week 44, TSW200 routers will come with a new QSG flyer in the packaging.
Change description
Change type
Replacement of QSG flyer
Detailed description
TSW200 devices manufactured starting from Q4 2022 will have a new QSG flyer in the packaging. The new QSG flyer includes the short version of QSG with a QR code/link to the full Web QSG version: teltonika-networks.com/QSG_TSW200.
Previous design:
New design:
The new flyer will include QR codes with URL links to RMS and the Web version of the QSG (Quick Start Guide) for the TSW200.
Change reasons
Reducing environmental impact.
Affected products information
Model
Affected order codes
Order code changes
TSW200
TSW200 ******
No changes
Upcoming change date
2022, week 44
Change impact
Risk assessment
Marketing material such as photos might need replacing.
Suggested implementation plan
Information included in this PCN will help adapt to the upcoming changes.
Acknowledgement of PCN receipt
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above.
To download the pdf version of this notification, click here.